Today's Date: Thursday, May 17, 2012
AERB
Committees-ACPSR-LWR
ADVISORY COMMITTEES

Advisory Committee for Project Safety Review of Light Water Reactors-Kudankulam NPP 3 to 6, Jaitapur NPP and Future LWRs
(ACPSR-LWR-2)
 
Constitution Order No.: CH/AERB/199/KKNPP-3to6, JNPP/2012/289 Dated: January 16, 2012
  Shri S.K. Mehta Chairman Formerly Director, RG, BARC, Mumbai  
  Shri S.K. Chande Vice-Chairman

Vice-Chairman, AERB, Mumbai

 
  Shri S.C. Hiremath Member Former Chief Executive, HWB  
  Dr. A.K. Ghosh Member Director (HSEG), BARC  
  Shri G.P. Srivastava Member Director, E&IG, BARC  
  Dr. P. Chellapandi Member Director (NSEG), IGCAR  
  Dr. S.M. Lee Member Former Director, SEG, IGCAR  
  Shri R.S. Yadav Member Head, LWRD. BARC  
  Dr. P.K. Vijayan Member Head, RED , BARC  
  Shri S. Bhattacharjee Member Former SD, TAPS - 1&2  
  Shri R.I. Gujarathi Member Former Director, NPSD, AERB  
Expert Member from Academic Institute  
  Prof. U.N. Gaitonde Member Dept. of Mechanical Engineering, IIT Bombay  
Representative from Ministry of Environment & Forests  
  Dr. S.K. Aggarwal Member Director (IA), MoEF  
Representative from Central Electricity Authority (CEA), New Delhi  
  Shri A.K. Gupta Member Chief Engineer (TE&TD), CEA  
Representative from NPCIL HQ  
  Director (Projects) Member NPCIL  
Project Representatives  
  Project Director/Station Director Member KKNPP 3 to 6 / JNPP  
Representatives from AERB  
  Head, SSED Member AERB  
  Director, OPSD Member AERB  
  Director, NPSD Member-Secretary AERB  
Permanent Invitees  
  Shri Utkarsh S.C.   NPSD, AERB  
  Shri S.K. Pradhan   NPSD, AERB  

TERMS OF REFERENCE

  • To review the applications seeking regulatory consents for the project stages of siting, construction and commissioning along with documents/reports submitted by the Responsible Organisation for the project and the recommendation reports of respective Site Evaluation Committee/Project Design Safety Committee and Committee to Review Security Aspects of Nuclear Facilities. The reviews are to be conducted based on safety requirements specified in AERB Codes & Guides, current IAEA & international documents, as applicable.

  • To submit recommendations to Chairman, AERB for issue of consents/clearanceswith observations/suggestions/stipulations, if any, at the major project stages or intermediate stages, as identified by AERB.

  • To advise AERB on R&D activities that might be required for long term infrastructural support for safe design and operation of LWR systems.

  • To review any other relevant safety issues considered appropriate by the Committee and those referred to the committee by Chairman, AERB.
 
Note: ACPSR-LWR-2 will perform reviews of all Light Water Reactor Projects other than Kudankulam NPP 1&2.  
   
   

Please report broken links to Webmaster