|
Advisory
Committee for Project Safety Review of PHWR based NPPs and PFBR
(ACPSR-PHWR/PFBR)
|
| |
| Reconstitution
Order No.: CH/AERB/199/2012/290 Dtd.: January 16, 2012 |
| |
Dr.
S.M. Lee |
Chairman |
Former
Director, SEG, IGCAR |
|
| |
Shri
S.K. Chande |
Vice-Chairman |
Vice-Chairman,
AERB E-mail |
|
| |
Shri
K.K. Vaze |
Member |
Associate
Dircetor, RD&D Group, BARC |
|
| |
Shri
Umesh Chandra |
Member |
Sr.
ED (Safety & KM), NPCIL |
|
| |
Shri
R.C. Rawal |
Member |
Former
Principal Project Dirctor, TAPP 3&4 |
|
| |
Shri
V.K. Gupta |
Member |
Retd.
Head, HPD, BARC |
|
Expert
Member from Academic Institute
|
| |
Prof.
J.B. Doshi |
Member |
Professor,
Mechanical Enginnering Department, IIT Bombay, Mumbai
Ph: 022 5782545(O) Fax:022-5723546 Ph: 022-5768525(R)) E-Mail |
|
Representative
from Ministry of Environment & Forests, New Delhi
|
| |
Dr.
S.K. Aggarwal |
Member |
Director
(IA), Min. of Env. & Forests, Paryavaran Bhavan, Lodhi Road,
New Delhi |
|
Representative
from Central Electricity Authority (CEA), New Delhi
|
| |
Shri
A.K. Gupta |
Member
|
Chief Engineer (TE&TD), CEA, R.K.Puram, Sewa Bhavan, New
Delhi |
|
Representative
from Central Boilers Board (CBB), New Delhi
|
| |
Shri
T.S.G. Narayanan |
Member |
Technical
Advisor (Boilers) & Secretary, CBB, Deptt. of Industrial
Policy & Promotion, Ministry of Commerce & Industry,
New Delhi |
|
| |
Shri
S.K. Jain |
Alternate
Member |
Development
Officer & Asst. Secretary, CBB, Deptt. of Industrial Policy
& Promotion, Ministry of Commerce & Industry, New Delhi
|
|
Representative
from Site Evaluation Committee (SEC)/PDSC/CSEC
|
| |
Chairman
of Site Evaluation Committee (SEC)/PDSC/CSEC |
Member |
(depending
on the stage of project under review) |
|
Representatives
from Organisation Responsible for the Project Under Review
(for PHWR based NPPs)
|
| |
Director
(Technical) |
Member |
NPCIL |
|
| |
Project Director or Chief Project Engineer/Station Director |
Member |
(depending
on the stage of project under review) |
|
Representatives
from Organisation Responsible for the Project Under Review
(for PFBR)
|
| |
Director,
Reactor Engineering Group |
Member |
IGCAR |
|
| |
Director (Technical), BHAVINI/Station Director, PFBR |
Member |
(depending
on the stage of project representing project) |
|
Representatives
from AERB
|
| |
Director,
OPSD |
Member |
AERB
E-mail |
|
| |
Director,
NPSD |
Member-Secretary |
AERB E-mail |
|
Permanent
Invitees
|
| |
Shri
Animesh Biswas |
|
NPSD,
AERB |
|
| |
Shri
V.R. Dhotre |
|
NPSD,
AERB |
|
|
| TERMS
OF REFERENCE |
|
1.
For Safety Clearance of Project Sites:
-
Conduct
review from Safety view-point of reports from Site Evaluation
Committees (SECs) and associated Safety Related Documents
submitted by the Organisation Responsible for the Project
under review, regarding acceptability of the proposed
site for locating the NPP, considering plant and public
safety and give its recommendations to AERB for Site Clearance
with associated observations/ suggestions/stipulations,
if any.
-
Identify
site related specific administrative and design measures
and tests/checks if any, that are necessary and to be
taken into consideration in recommending acceptability
of the proposed site of NPP from Safety viewpoint.
2.
For Authorisations at Major Project Stages:
-
Conduct
review from safety point of view of reports and recommendations
from Project Design Safety Committees (PDSCs)/Civil Engineering
Safety Committee (CESC) and associated safety documents
submitted by the Organisation Responsible for the project
and give its recommendations to AERB for Authorisation
with observations/suggestions/stipulations, if any for
Nuclear Power Plants/ Research Reactors for major Project
Stages such as Construction, Commissioning, Operation
& Decommissioning and as required for their intermediate
stages.
-
Reviews
may take into consideration, as appropriate to the project
stage, the adequacy of status of management set up, completion
of construction and commissioning of different systems,
training and qualification of staff, quality assurance
programme, emergency preparedness in addition to consideration
for adequacy of design provision for Nuclear Safety and
Radiation Safety.
- Review
any other relevant safety issues referred to the committee
by Chairman, AERB.
Note:
Authorisation for the stages of First Approach to Criticality
(FAC) and Raising of power to 100% FP will be through a joint
review by SARCOP and ACPSR. For other stages of Authorisation
after first criticality, copies of the proposals will be put
up to SARCOP for information.
|
|
|