(TDP), Chembur   is   under   shutdown   due   to   under  the  Factories  Act,  1948  was  valid  till
                  non-availability  of  feed phosphoric  acid  from   December  31,  2020.  HWP-Kota  application  for
                  fertilizer plant.   However,   trial   operation   for   renewal  of  the  licence  was  reviewed  in  AERB
                  developmental activities were carried out.    following  multi-tier  review  process.  Safety
                  During  the  year  following  licence  applications   review  indicated  that  there  was  no  major
                  were reviewed:                               operational or safety related issue at HWP-K. The
                                                               planned modications and safety upgrades were
                  (a)    Renewal of licence for operation of HWP-    carried out based on operating experience. Based
                      Talcher                                  on safety review, AERB renewed the licence for
                                                               operation of HWP- Kota for a period of ve years
                  The Licence for operation of HWP-Talcher issued   i.e. up to December 31, 2025.
                  under the Atomic Energy Factories Act, 1948 was
                  valid  till  August  31,  2020.  HWP-Talcher   (d)    Consent  for  Siting  of  Solvent  Extraction

                  application for renewal of licence was reviewed   Plant at HWP-Tuticorin
                  by  AERB  following  multi-tier  review  process.
                  Safety review indicated that the performance of   HWP-Tuticorin  submitted  an  application
                  HWP-Talcher w.r.t. operation and safety has been   for Siting consent of setting up Solvent Extraction
                  satisfactory and there were no major operational   Plant  (SXP)  for  extraction  of  Uranium  from
                  or  safety  related  issue  with  any  of  the  facility   Phosphoric Acid. Based on safety review, AERB
                  system. Based on safety review, AERB renewed   granted the consent for Siting for setting up SXP at
                  the licence for operation of HWP-Talcher under   HWP-Tuticorin  under  the  Atomic  Energy  Act,
                  the Factories Act, 1948 up to August 31, 2025.   1962 (and rules framed thereunder) with validity
                                                               up to September 30, 2025.

                  (b)   Renewal of Licence for operation of HWP-
                      Manuguru                                  (e)     Extension    of    Consent    for  Siting    and
                                                                    Construction of Solvent Production Plant
                       The  Licence  for  operation  of  HWP-       at HWP-Tuticorin
                  Manuguru  (HWP-M)  issued  under  the  Atomic
                  Energy Factories Act, 1948 was valid till June 30,   The    existing    consent    for    Siting    &
                  2020. HWP-Manuguru application for renewal of   Construction    of    Solvent    Production    Plant
                  licence was reviewed in AERB following multi-  (SPP)  at  HWP-Tuticorin  was  valid  up  to
                  tier review process. Safety review indicated that   December 2020. HWP-Tuticorin had submitted a
                  the performance of HWP-M w.r.t. operation and   request for extension of validity of the existing
                  safety  has  been  satisfactory  during  the  review   consent by one year. During review, it was noted
                  period.  HWP-M  had  carried  out  several   that  planned  construction  activities  got
                  modication  to  address  the  operational   postponed  due  to  delay  in  obtaining  required
                  problems,  to  overcome  the  obsolescence  and   clearance  from  Tamilnadu  Pollution  Control
                  improve  the  plant  performance.  HWP-M  has   Board and difculties in foundation work of SPP
                  satisfactorily  addressed  the  recommendations   buildings because of elevated ground water table
                  made  during  safety  review  and  inspections  of   at the site. Further, due to COVID-19 pandemic,
                  AERB. Efuents discharges from the plant were   the material supply and erection activities were
                  well within the prescribed limits. On-site and off-  affected. Based on safety review, AERB approved
                  site emergency preparedness plans are available   the extension of validity of existing consent for
                  and emergency exercises are being periodically   Siting  &  Construction  of  SPP  up  to  December
                  conducted.  Based  on  safety  review,  AERB   2021.
                  renewed  the  licence  for  operation  of  HWP-
                  Manuguru  under  the  Factories  Act,  1948  up  to   (f)     Consent  for  Siting  and  Construction  for
                  June 30, 2025.                                    setting up the 24kA Prototype Sodium Cell
                                                                    at HWP, Baroda
                      AERB  also  granted  permission  for
                  installation & operation of O-18 unit located in the   HWB has taken up the production of nuclear
                  premises of the HWP-Manuguru.                grade sodium to cater to the requirements of the
                                                               future Fast Breeder Reactors (FBR) in India. In this
                  (c)     Renewal   of   Licence   for   Operation of   regard, HWB proposed to set up 24kA prototype

                       HWP-Kota                                sodium cell at HWP-Baroda. The prototype 24kA
                                                               sodium  cell  will  be  operated  for  around  1  to  3
                      Licence for operation of HWP-Kota issued   years for data generation and validation of the


                                                                                                            24